Electrical for Dubai Office Fit-Outs

Wiring, outlets and distribution.

Browse the electrical range ↓

About Electrical

Electrical is the trade every other category quietly depends on - lighting, HVAC, CCTV, and workstations all draw off the same distribution and cabling that goes in first. PickTheBrick supplies and installs wiring, outlets, and distribution boards for office fit-outs, priced per square metre and coordinated as the first trade sequenced into the ceiling void and walls.

Because electrical work happens early and gets closed up behind ceilings and walls, it's the category where getting the layout right the first time matters most - your Captain works from your space and desk-count plan to size distribution correctly before anything is closed in, rather than discovering a shortfall after the ceiling's already up.

Our Electrical Range

Standard Circuits
Ducab Single Core Cable 2.5mm — Standard Circuit Wiring
AED 45/sqm, installed
Heavy Duty / Sub-Mains
Ducab Single Core Cable 6mm — Heavy Duty / Sub-Main Wiring
AED 75/sqm, installed
Copper Cat Cabling
Schneider Actassi Cat6 UTP Cable, 305m Reel (Mepkart)
AED 548.57/lm, installed
Copper Cat Cabling
Schneider Actassi Cat6 UTP Cable, 23AWG Solid Copper, 305m Reel (Mepkart)
AED 640/lm, installed
Fiber Optic
Single-Mode Fiber Optic Cable, 4-Core (DUMMY PRICE - pending quote from Cables House)
AED 5/lm, installed
Lighting & Power DBs
Indoasian SPN Distribution Board, 10 Way (GoSwitchgear)
AED 231.44/sqm, installed
Lighting & Power DBs
Indoasian Row Distribution Board, 16 Way 3 Row (GoSwitchgear)
AED 358.4/sqm, installed
Lighting & Power DBs
Indoasian Row Distribution Board, 16 Way 5 Row (GoSwitchgear)
AED 455.69/sqm, installed
Specialty Boards
Indoasian 8-Way TPN Distribution Board
AED 130/sqm, installed
Standard Range
Tenby 13A Single Switch (Homesmiths)
AED 46.5/sqm, installed
Standard Range
Tenby Switch 1 Gang 1 Way (Homesmiths)
AED 41.49/sqm, installed
Standard Range
Oshtraco 3-Way Universal Multi Socket (Homesmiths)
AED 75.5/sqm, installed
Standard Range
Veto Weatherproof Switch & Socket, 2 Gang (Homesmiths)
AED 126.5/sqm, installed
Premium / Designer Range
Schneider AvatarOn Gold Switch Socket, 2 Gang (Mepkart)
AED 101.5/sqm, installed
Premium / Designer Range
Schneider Vivace E Switched Socket with USB A/C (Mepkart)
AED 123.5/sqm, installed
Premium / Designer Range
Schneider Vivace E 2-Way Switch, 1 Gang (Mepkart)
AED 53.5/sqm, installed
Circuit Wiring
Ducab Fire-Rated Circuit Cable — Emergency Lighting Sub-Circuit
AED 50/sqm, installed
Control Systems
Denko EMCEL 12NM Surface Mounted Emergency Light
AED 158/sqm, installed
Earthing Systems
Copper Bonded Earth Rod with Clamp — 14mm
AED 10/sqm, installed
Lightning Protection
nVent ERICO Air Terminal — Lightning Protection
AED 350/sqm, installed

Why Choose PickTheBrick for Electrical

Sized to your actual desk and equipment count

Distribution and outlet layout is planned against your real headcount and equipment plan, not a generic per-sqm assumption that runs short on power points.

First trade in, so nothing gets closed up wrong

Electrical is sequenced before ceiling and partition close-up, so cabling and outlet positions are locked in before they become invisible.

DEWA-compliant as standard

All wiring and distribution work is specified to meet DEWA requirements, which your Captain documents as part of any authority approval your fit-out needs.

Electrical FAQs

How is electrical pricing calculated for an office?

Electrical is priced per square metre of floor area, scaled to a standard commercial outlet and lighting circuit density - higher equipment loads like a server room can be scoped as an addition.

Does electrical work need a DEWA inspection?

Yes, DEWA typically inspects new commercial electrical installations - your Captain includes this in the authority approvals process if your fit-out requires it.

Can we add extra power outlets after the initial quote?

Outlet count can be adjusted before installation begins, but changes after cabling is closed up behind ceilings or walls are more disruptive - it's worth over-specifying slightly at quote stage.

Is electrical installation sequenced before or after partitions go up?

First-fix electrical typically runs before ceiling and partition close-up so cabling routes are accessible, then final connections happen once other trades are in place.

Ready to add electrical to your quote?

Mix and match with any other category - flooring, partitions, lighting, and more - in one fitout quote.