HVAC for Dubai Office Fit-Outs
Air conditioning, ducting and ventilation.
Browse the hvac range ↓About HVAC
Air conditioning is not optional in a Dubai office, and getting it wrong shows up immediately as complaints about hot corners or a system that can't keep up once the floor fills with people. PickTheBrick supplies and installs air conditioning, ducting, and ventilation for commercial fit-outs, priced per square metre and sized against your actual floor plate and occupancy.
HVAC has to be coordinated tightly with the ceiling trade, since ducting and diffusers run through the same void as electrical cabling and ceiling grid - your Captain sequences this so the mechanical layout is agreed before the ceiling closes it in, rather than forcing a rework later.
Our HVAC Range
Why Choose PickTheBrick for HVAC
Sized to your floor plate, not a generic estimate
Cooling load is calculated against your actual square metreage and occupancy plan, so the system is sized to keep up once desks fill in - not undersized to hit a lower quote.
Coordinated with the ceiling trade above it
Ducting and diffuser layout is agreed with the ceiling installer before either trade closes up the void, avoiding rework once tiles are in place.
Zoned for meeting rooms and cabins separately
Enclosed rooms can be given their own zone and controls, so a full boardroom doesn't leave the rest of the floor uncomfortably cold.
HVAC FAQs
How is HVAC pricing worked out for an office fit-out?
HVAC is priced per square metre, calculated against standard commercial occupancy and cooling load for Dubai's climate - unusually high-heat equipment areas can be scoped separately.
Can meeting rooms have separate temperature control?
Yes - enclosed rooms and cabins can be zoned with independent controls as part of the ducting layout, rather than sharing one setting with the open floor.
Does HVAC installation require a Civil Defense inspection?
Ventilation and fire-life-safety interfaces (like duct dampers) are typically covered under the authority approvals your Captain manages if your fit-out requires formal sign-off.
How long does HVAC installation take?
Ducting and unit installation is usually sequenced alongside ceiling works over several days to a couple of weeks depending on floor area - your Captain gives an exact timeline once the layout is finalised.
Ready to add hvac to your quote?
Mix and match with any other category - flooring, partitions, lighting, and more - in one fitout quote.
Browse the range ↑